Gadchiroli pitched as Maharashtra’s future green steel hub India set to drive next global steel demand wave Italy crude steel output rises 3.1% in May Green steel progress remains slow worldwide
Adani Green Energy declared its operation for 775 megawatt solar power projects in Khavda, Gujarat. The capacities have been operationalised after securing relevant clearances, Adani Green Energy Ltd (AGEL) mentioned in an exchange filing.
Adani Green Energy through its various wholly-owned stepdown subsidiaries has operationalised an aggregate 775 MW solar power projects at Khavda, Gujarat, it said.
"undefinedd on the relevant clearances, it was decided on March 29, 2024 to operationalise the plant and commence power generation from March 29, 2024," the company said.
Part of the Adani Group, AGEL has the largest operating renewable portfolio in India, spread across 12 states.
Also Read : Captive, commercial coal blocks output climbed 27% to 147 MT in FY24 Waaree Renewable Technologies gets solar project worth ₹547 cr