Breaking News

JSW Steel rises 2% on gas supply worries HSBC raises Tata Steel target to ₹250 British Steel to supply 120,000 mt billet to Nigeria ₹3,200 crore Tata Steel EAF starts in Ludhiana

Saarstahl Renews Long-Term Steel Supply Deal with Max Bögl

687421_1772001603_small.jpg
Europe 25 Feb 2026 12:10 PM IST steelorbis

 Germany’s Saarstahl has renewed a long-term supply agreement with Max Bögl Wind, extending a partnership that has supported wind-tower production since 2015. The updated deal increases both delivery and purchasing volumes, strengthening supply reliability as Europe accelerates new wind energy projects.

A key focus is prestressing steel wire produced by Saarstahl’s subsidiary DWK Drahtwerk Köln. This high-strength wire is used in hybrid wind turbine towers, where it helps “pre-stress” concrete sections—improving structural stability, durability, and resistance to heavy operational loads. As turbines grow larger and towers face tougher performance demands, consistent access to high-performance long steel products becomes critical for manufacturers.

Overall, the renewed agreement signals deeper strategic collaboration between the two companies and supports smoother planning for turbine tower output in the years ahead.