India–US Trade Tensions Rise Over Steel and Auto Tariffs NMDC Limited reports a 38% drop in Q4 FY24 consolidated net profit RINL to Raise $23 Million Through Land Sales Amid Crisis
To get the project started fast, the Centre issued a gazette notification last week appointing sub-divisional officials and a relief and rehabilitation officer for land acquisition for a 32-kilometre greenfield route connecting to the proposed Vadhavan port.
The highway will need to be acquired in 571 hectares. It will be connected to the Mumbai-Ahmedabad and Mumbai-Vadodara highways. The port will be developed by reclaiming 1,448 hectares from the sea.
Also Read : Bihar govt proposes a budget of ₹2.79 lakh cr for fiscal 2024-25 Power ministry calls states for swift adoption of renewable energy rules