Gadchiroli pitched as Maharashtra’s future green steel hub India set to drive next global steel demand wave Italy crude steel output rises 3.1% in May Green steel progress remains slow worldwide
BHEL has received an order of over ₹3,500 crore from Adani Power Limited to build a thermal power facility in Raipur, Chhattisgarh.
The company has "signed contract agreement signed June 5, supply of equipment (boiler, turbine, generator) and supervision of erection and commissioning for 2x800 MW power project brd on Supercritical Technology", BHEL stated in a filing with the exchange.
The order is valued at about ₹3,500 crore, not including GST, according to the company. BHEL stated that the boiler and turbine generator will be constructed at its factories in Trichy and Haridwar.
Also Read : IEA to begin security programme for minerals critical to energy sector JSW Energy starts construction as part of its foray into battery storage services